Red EngineeringRed Engineering
    Menu
    • Home
    • Our Solutions
    • Our People
    • Our Process
    • Our Facilities
    • Our Culture
    • Careers
    • RED Report 2026

    Cavendish Nuclear Limited

    The Challenge

    To engineer a solution to significantly reduce the volume of Plutonium Contaminated Material (PCM) waste in storage, with the added benefit of sustainably and safely lowering long term storage and disposal costs.

    Our Solution

    RED is part of an integrated team engineering a full-scale prototype furnace system that uses plasma technology to size reduce and vitrify drums containing simulated PCM waste. The prototype will provide a technology demonstration that will support strategic decision making to inform future UK PLC investments.

    Benefits to the client

    RED has been part of Sellafield’s ‘Higher Activity Waste Thermal Treatment Team’ since inception supporting project definition, concept development and initial technology selection.

    Back
    • COMPANY DOCUMENTS

      Quality Policy
      Health and Safety Policy
      Annual Report

    • LATEST NEWS

      To learn about the latest developments at RED, please follow us on our social media channels

    • CONTACT US

      Tynedale House, Burn Lane, Hexham, Northumberland, NE46 3RU

      (+44) 01434 648240

      info@redengineering.co.uk

    RED Engineeering © 2026
    Top