OVER 600 INNOVATIVE SOLUTIONS DELIVERED AT PACE. FOR EXAMPLE:
TECHNOLOGY DEVELOPMENT
Cavendish Nuclear Limited
‘PCM drummed waste plasma treatment development to enable strategic decision making for UK PLC
Sellafield Limited
DPaCC – a technology platform that can help Sellafield move humans away from harm and get hands out of gloveboxes
PROJECT SPECIFIC SOLUTIONS
Subsea 7
Tool Assisted Piggyback Blocking system that clamps together 2 pipelines on a continuous basis without manual intervention.
NWS
Bespoke tool for the subsea installation of scour protection as part of a new build nuclear power station development
JDR Cables
Development and delivery of a comprehensive test programme to qualify the mechanical properties of the cable against relevant industry standards.
REACTIVE PROBLEM SOLVING
Prime Contractor
Development and supply of shallow water umbilical system
Subsea Cable Manufacturer
Development of retrofit subsea umbilical clamp arrangement
Prime Contractor
Rapid derivation of burial characteristics of dropped objects