Red EngineeringRed Engineering
    Menu
    • Home
    • Our Solutions
    • Our People
    • Our Process
    • Our Facilities
    • Our Culture
    • Careers
    • RED Report 2026

    Subsea 7

    The Challenge

    Automation of the piggyback blocking process when simultaneously laying 2 pipelines offshore

    Our Solution

    A Tool Assisted Piggyback Blocking system that clamps together 2 pipelines on a continuous basis without manual interevention.

    Benefits to the client

    A significant increase in the speed (circa 6X faster) and safety of the pipelay operation providing a multi-million pound saving in project cost

    Back
    • COMPANY DOCUMENTS

      Quality Policy
      Health and Safety Policy
      Annual Report

    • LATEST NEWS

      To learn about the latest developments at RED, please follow us on our social media channels

    • CONTACT US

      Tynedale House, Burn Lane, Hexham, Northumberland, NE46 3RU

      (+44) 01434 648240

      info@redengineering.co.uk

    RED Engineeering © 2026
    Top