Red EngineeringRed Engineering
    Menu
    • Home
    • Our Solutions
    • Our People
    • Our Process
    • Our Facilities
    • Our Culture
    • Careers
    • RED Report 2026

    TAQA

    The Challenge

    Development of a tool to allow the unlocking and recovery of a subsea XT from a wellhead to enable the successful decommissioning of a subsea oil field in the North Sea.

    Our Solution

    Developed in 4 phases (specification and concept development, proof of concept testing, detail design, manufacture, assembly and testing), the SRT is a bespoke tool that can be deployed by an offshore drilling rig. Final assembly and testing was completed at the RTC, working closely with the client team who were going to operate the tool offshore.

    Benefits to the client

    Confidence that the XT can be recovered after over 35 years on the seabed, mitigating the risk of expensive vessels delays.

    Back
    • COMPANY DOCUMENTS

      Quality Policy
      Health and Safety Policy
      Annual Report

    • LATEST NEWS

      To learn about the latest developments at RED, please follow us on our social media channels

    • CONTACT US

      Tynedale House, Burn Lane, Hexham, Northumberland, NE46 3RU

      (+44) 01434 648240

      info@redengineering.co.uk

    RED Engineeering © 2026
    Top